Get Price

Methods Of Calculating Tonnage In Mining

  1. Home
  2. News
  3. Methods Of Calculating Tonnage In Mining
ORE RESERVE ESTIMATION

Ore Reserve Estimation

mining. This study found that all estimating techniques overestimated the tonnage the polygon method bY 23 the inverse-distance-squared by 26 and kriging by only 12. A second estimate using all available drill hole data was made, and again the three methods overesti-nated the tonnage

Calculation of Volume and Tonnage of Ore Deposit

Calculation Of Volume And Tonnage Of Ore Deposit

Abstract. For the calculation of the volume and the tonnage of ore deposits there is a variety of available methods to choose from, each suited for a particular deposit. These methods fall into two categories reserve calculation on the basis of cross-sections and on the basis of longitudinal planar sections or level plans respectively.

Narrowvein modelling and Mineral Resource estimation

Narrowvein Modelling And Mineral Resource Estimation

Narrow veins are major sources of many commodities, including gold, silver, tin, tungsten, coal, uranium and sometimes copper, lead and zinc. Mining this narrow style of mineralization can be considered as relatively high risk, not only due to the high cost of exploration and mining per unit of metal, but also to the frequently limited size of the resource.

Analytical Model To Determine Of The Optimal Block

Analytical Model To Determine Of The Optimal Block

methods. These techniques are usually very costly and need great preparation. However, the high production rate of these methods, make them cost-effective ones. The Block Caving method is an example of these methods, which is similar to surface mining methods in terms of production, in that the cost of production is low.

Measurement of Size Distribution of Blasted Rock

Measurement Of Size Distribution Of Blasted Rock

Measurement of fragment size of blasted rock is considerably important in order to evaluate the efficiency of the production blasting operation. There are several methods of size distribution measurement and fall under two broad categories direct method and indirect methods. The sieve analysis is the direct and accurate method of measuring size

Determining Stripping Ratio Basic Mining Techniques

Determining Stripping Ratio Basic Mining Techniques

Apr 04, 2016 Determine the BESR in mining and processing a 0.60 copper ore deposit if the selling price of copper in concentrate is 1.63kg and the overall unit costs are 6.80ton and the cost of handling unit weigh of waste is 7.50ton. The overall recovery is 92.

Mineral Appraisals What is the Value of a Quarry or

Mineral Appraisals What Is The Value Of A Quarry Or

Capital includes the mining machinery and equipment, plus the processing plant, to produce a finished product. The raw ore is extracted by surface open pit or subsurface underground mining methods processed to a marketable state and delivered to the market. Labor includes all human effort, abilities and skills, ... Calculating Tons in the ...

PDF Stripping Ratios Pit Limits amp Cutoff Grade

Pdf Stripping Ratios Pit Limits Amp Cutoff Grade

A review of cut-off grade policy models for open pit mining operations By Iv n C rcamo Optimum cut-off grades calculation in open pit mines with regard to reducing the undesirable environmental impacts

Design of Bord and Pillar method in coal mines

Design Of Bord And Pillar Method In Coal Mines

Feb 27, 2016 Mining is the mother industry for other industries. For effectiveness in mining, different methods have been approached keeping in mind the production and safety. One of such methods is the Bord and Pillar method of mining. Bord and Pillar method of mining is one of the oldest methods. 3.

ore dilution and ore recovery SlideShare

Ore Dilution And Ore Recovery Slideshare

Oct 04, 2019 It has been noted that instead of utilizing labour intensive mining methods to high tonnage bulk mining has decreased the ability to control ore recovery. In a practical underground and open pit setting, the ore recovery is affected by three main factors as follows Ore wedges located at the top and bottom sills of the panel are unable to be ...

Reserve Estimation PDF Tonnage Density

Reserve Estimation Pdf Tonnage Density

Cubical opening method Dig up a pit of 1mx1mx1m size and weight all the material this weight is tonnage factor. For sulphide ore deposit at initial exploration this method is not applicable. In case of iron ore , limestone, rock Phosphate is applicable. in the mining stage normally bulk density is determined by this method Conventional density ...

Break Even Analysis How to Calculate the Cut Off Grade

Break Even Analysis How To Calculate The Cut Off Grade

Before I can calculate the cut off grade, I first need to show a basic equation which converts a troy ounce into grams per ton 1 troy ounce 31.1034768 grams per ton 34.2857143 grams per tonne. As you can see, the difference between a ton and a tonne is approximately 10. Then, you need to be aware of the following conversions 1 ton ...

Methods to calculate land area Land survey

Methods To Calculate Land Area Land Survey

Methods of Calculating or Measuring the Area of Land. Surveying irregular and large land tracts can be done by various methods. While some methods are simple and based on basic geometry, others are complex and may involve GPS and satellite imagery. The different options and technologies available to the surveyor have been investigated in this post.

Depletion method of depreciation explanation formula

Depletion Method Of Depreciation Explanation Formula

Depletion method of depreciation is mostly used by the companies that have assets that are natural resources like oil, gas, coal, mines, quarries or other wasting assets.. This method is named as depletion method because the reduction of a natural resource or asset is known as depletion of that resource or asset and thus is used to depreciate assets that are natural resources.

Grade Tonnage Curve How Far Can It Be Relied Upon

Grade Tonnage Curve How Far Can It Be Relied Upon

mining method economics With all the rigour to calculate a constrained by the mining method grade tonnage curve it is first necessary to calculate estimate or simulate the resources in blocks and then to simulate the mining method afterwards to obtain the minable reserves. The problem

SIMPLIFIED MEASUREMENT TONNAGE FORMULAS

Simplified Measurement Tonnage Formulas

69.209 Calculation of tonnages. a Gross tonnage. 1 Except as in paragraphs a2 through a5 of this section, the gross tonnage of a vessel designed for sailing is one-half of the

Pillar Strength and Design Methodology for Stone Mines

Pillar Strength And Design Methodology For Stone Mines

area method is not valid, such as irregular pillars, limited extent of mining or variable depth of cover, numerical models such as Lamodel 19 can be used to estimate the average pillar stress. Pillar Failure Pillar failure occurs when a pillar is loaded beyond its peak resistance and load shedding, yielding, shearing or collapse occurs 9.

Estimation of the potential production rate

Estimation Of The Potential Production Rate

Estimation of production rate is a problem that has been looked at by many scholars. The most well-known scholar to look at the problem was H. K. Taylor who developed the empirical Taylors Rule, which is a rule of thumb that is commonly taught to Mining Engineering students. While the most popular, Taylors Rule is not the only method that ...

Analysis of Economic Evaluation Methods of

Analysis Of Economic Evaluation Methods Of

Analysis of Economic Evaluation Methods of Environmental Damage at Calculation of Production Efficiency in Mining Industry Grigory B. Malyshkov1, Leonid S. Sinkov2 and Liubov A. Nikolaichuk3 Department of Economics, Accounting and Finance, Saint-Petersburg Mining University, Vasilyevsky Island, 21 Line, 2, Saint-Petersburg, 199106, Russia.

Mining Valuation Techniques PNAV PCF EVResource

Mining Valuation Techniques Pnav Pcf Evresource

The best way to value a mining asset or company is to build a discounted cash flow DCF model that takes into account a mining plan produced in a technical report like a Feasibility Study. Without such a study available, one has to resort to more crude metrics. Here is an overview of the main valuation methods used in the industry

APPLICATION OF RIPPERDOZER COMBINATION IN

Application Of Ripperdozer Combination In

The share of opencast methods has gone upto 70 of worlds total mineral production. The surface mining of hard rocks and ore demands drilling and blasting. But these techniques have many adverse effects on environment. So todays eco-conscious world demands introduction of improved technology for blast free, safe and eco-friendly mining.

Toward Pillar Design to Prevent Collapse of Roomand

Toward Pillar Design To Prevent Collapse Of Roomand

Room-and-pillar mining accounts for a significant portion of the total mineral production in the United States As shown in table 1, well in excess of 6 billion worth of mineral commodities are produced each year by this method. A substantial portion 3.55 billion of coal production still comes from room-and-pillar mining. Metallic minerals

EVALUATION OF BORD AND PILLAR MINING SYSTEM

Evaluation Of Bord And Pillar Mining System

For effectiveness in mining, different methods have been approached keeping in mind the production and safety. One of such methods is the Bord and Pillar method of mining. Bord and Pillar method of mining is one of the oldest methods. The key to the successful Bord and Pillar mining is selecting the optimum pillar size.

v115n8a3 Reconciliation along the mining value chain

V115n8a3 Reconciliation Along The Mining Value Chain

The array of different mining methods results in different challenges in terms of grade control and tonnage reconciliation. In most massive mining operations, grade control programmes must be specified in terms of protocols that define sampling points and methods, appropriate for the method, from the creation of the gradeblock model to the final

4 Coal Mining and Processing Coal Research and

4 Coal Mining And Processing Coal Research And

The cost per ton of mining coal by surface methods is generally lower than that by underground methods. In the United States, in addition to a continuous growth in coal production since the 1960s, there has been a dramatic shift in production from underground mining to surface mining Figure 1.6 .

Hard Rock Miners Handbook

Hard Rock Miners Handbook

of the Mining Journal, www.infomine.com, and many other members of the mining community, the Hard Rock Miners Handbook has been distributed to over 113 countries worldwide. Web hits and downloads continue as students and professors, miners, engineers , and mining executives embrace the Handbook as an invaluable source of practical

PDF BLOCK MODEL KNOWLEDGE FOR MINING ENGINEERSAN

Pdf Block Model Knowledge For Mining Engineersan

likely scale of mining and size of equipment. In the literature on MIK modeling, this alteration in the tonnage and grade above a cut-o grade is often considered

Lecture 4 Underground Mining SlideShare

Lecture 4 Underground Mining Slideshare

Nov 02, 2011 Underground mining, Underground mining methods. Lecture 4 Underground Mining 1. Hassan Z. Harraz hharraz2006yahoo.com 2010- 2011 This material is intended for use in lectures, presentations and as handouts to students, and is provided in Power point format so as to allow customization for the individual needs of course instructors.

PAPER OPEN ACCESS Ore Reserve Estimation of Saprolite

Paper Open Access Ore Reserve Estimation Of Saprolite

the calculation of volume only on the saprolite zone and tonnage will only be calculated starting from the level of 1.6 up. Reserve tonnage is obtained by multiplying the volume of saprolite 50969 m3 with density ore 1.5 tonm3. So that the ore tonnage is 76453.5 tons in accordance with the calculation using Surpac 6.2.

Assessing the Design Size and Operation of Sediment

Assessing The Design Size And Operation Of Sediment

Preliminary site assessment e.g. site layou t and size, hydrology data, soil types, etc. Prediction testing Soil loss calculation Revised Universal Soil Loss Equation RUSLE, or validated alternative predictive tool Pond inflow rates should address seasonal variability as well as storm events.

UNDERGROUND COAL MINING FACTORS COST AND

Underground Coal Mining Factors Cost And

Definition of Longwall Mining A high extraction method of mining along the face of a predefined block of coal, referred to as a panel, while allowing the immediate roof to collapse upon advancement Panel Configuration Panels generally range in size from 500 to 1,000 feet

Optimization of Chain Pillars Design in Longwall Mining

Optimization Of Chain Pillars Design In Longwall Mining

the pillar strength to applied stress ratio. For calculation of the optimum size of chain pillars in the TML mine, the Hsiung-Peng method is used with the data in Tables 1 and 2. The result of the calculation is a recommended pillar width of 10.6 m. The Hsiung-Peng method assumes that the uni-axial compressive strength of the pillar yield zone is

methods of calculating tonnage in mining

Methods Of Calculating Tonnage In Mining

methods of calculating tonnage in mining. Cubical opening method dig up a pit of mxmxm size and weight all the material this weight is tonnage factor for sulphide ore deposit at initial exploration this method is not applicable in case of iron ore , limestone, rock phosphate is applicable in the mining stage normally bulk density is determined by this method conventional density.

Calculation of Ore Tonnage amp Grade from Drill hole Samples

Calculation Of Ore Tonnage Amp Grade From Drill Hole Samples

Jan 21, 2016 Calculation of Ore Tonnage amp Grade from Drill hole Samples. ORE RESERVE CALCULATIONS. The method referred to as standard is simply one combining mathematical calculations with judgment. Textbooks advise that ... MINERAL ORE RESERVE Case 1. MINERAL ORE RESERVE Case 2. MINERAL ORE RESERVE Case 3.

methods of calculating tonnage in mining

Methods Of Calculating Tonnage In Mining

3 Calculation of Volume and Tonnage of Ore Deposit. For the calculation of the volume and the tonnage of ore deposits there is a va riety of available methods to choose from, of Mining and Metallurgy 1988